Projects

We understand the complexity of managing utilities on site. Our core services include excavation, reinstatement and cable pulling.

MBS Construction Ltd is qualified and accredited to several UK and international standards to ensure optimum health, safety and quality performance on site.

MBS Construction Ltd works to exacting standards, irrespective of the project. We fully understand the need to adhere to regulatory standards across health and safety and the environment and take our commitment to client service extremely seriously.

Since 2012

Forte Widley Dual Circuit 132kv

Forte Widley Dual Circuit 132kv, this is one of our ongoing projects for SSEN Major Works in Portsmouth. This is an Installation of ducting under a river to replace the existing oil filled cable.

View Project

Reading 132/33kv Supply Upgrade

Reading town to Reading main project dual circuit 132kv plus coms and various circuits of 33kv along the route. 70% carriageway lane closures and two/multi way lights 30% grass in park land 4km running from Reading main sub to Reading town sub.

View Project

Installation of ducting, Ascot to Longcross

Ascot project is dual circuit of 33kv plus coms. 100% carriageway road closures and two/multi way lights. 13.5km running from substation on Ascot high street to substation at Longcross studios.

View Project

Cable Pulling Monahan way, Carterton

One team completed the HV overlay works, Jason Chapel was the foreman on site. Excavated, verge, footway and two road crossings.

View Project

EUNetwork/JSM – From Slough to Welwyn Garden City

Installed duct throughout route with 100% road closure at various stages and multi way lights. 128km running from Slough to Welwyn Garden City (across 4 suburbs) Restatement as needed.

View Project

Colt Romford, Essex

Excavation and installation of approximately 11 kms of 1W 96mm and 1W 96mm sub ducted OD uPVC telecommunications primary duct in the public highway whether footway, carriageway or verge for the provision of a fibre optic cable feed.

View Project

Kentish town to Hatfield (SOW)

Excavation and installation of approximately 31.52kms of 1W 96mm and 1W 96mm sub ducted OD uPVC telecommunications primary duct in the public highway whether footway, carriageway or verge for the provision of a fibre optic cable feed

View Project

KAO Park project – North West London To Hatfield

Excavation and installation of approximately 50.2 kms of 1W 110mm OD uPVC telecommunications primary duct in the public highway whether footway, carriageway or verge and via the tow path of the Paddington Arm, Grand Union Canal for the provision of a fibre optic cable.